One team from application to switchboard
We handle the application, the new mains and the connection. Then we upgrade your switchboard to match.
You get one team handling it from quote to sign off. See Level 2 electrician.
Licensed NSW electrical contractor · Lic 315687C
Has your Sutherland Shire home or business outgrown single phase power?
We can help. Altech Electrical does single phase to three phase power upgrades across the Sutherland Shire.
I’m Ryan James Alderman, owner and director of Altech Electrical. I’ve worked as an electrician for more than 10 years, and our company holds NSW Contractor Licence 315687C.
We handle the application, the new mains and the connection. Our customers rate us 5.0 from 26 Google reviews.
Altech Electrical
A 3 phase power upgrade touches your mains, your meter panel and your switchboard. Here’s why locals hand it to us.
We handle the application, the new mains and the connection. Then we upgrade your switchboard to match.
You get one team handling it from quote to sign off. See Level 2 electrician.
I’ll check your supply and tell you whether three phase is worth it for your plans. Most homes run well on single phase power.
Quotes are free for new work, installations, upgrades and renovation wiring. You’ll know the price before any work begins.
Every job runs under Altech Electrical Pty Ltd’s NSW contractor licence 315687C. I’m the nominated supervisor, so you know who’s responsible.
You can look up both our licences on the NSW Government Verify Licence register.
Our Services
Big loads can outgrow single phase power. Here’s what we do about it.
Big loads like EV chargers, pool heating and large air con can outgrow single phase power. A three phase upgrade spreads that load across three supplies.
Workshop machinery needs more than a household supply. We handle single phase to three phase upgrades for businesses, and the switchboard work that goes with them.
A three phase switchboard upgrade gives your property more capacity. We upgrade the board to match the new supply.
Most homes charge happily on single phase with a 7kW charger. Three phase suits long daily drives, two EVs or cars that accept faster home charging.
| Single phase | Three phase | |
|---|---|---|
| Where it is used | Most homes and smaller buildings | Workshops, larger buildings and homes with many large appliances |
| Strengths | Simple and reliable for household appliances | Runs larger machinery and appliances more effectively |
| Limits | Can struggle in a bigger home with several large appliances | More components, so repairs cost more |
What Changes the Cost
The cost of going from single phase to three phase depends on the property. These are the main factors.
How easy is it to run the three phase connection to your home? Easier access means less labour.
Some properties need a private power pole added. That changes the price.
Your meter box may need upgrading to take the new supply.
Digging may be needed for underground service lines. Trees may also need trimming.
Count the service fuses on your meter board. Three service fuses means three phase power, and one means single phase.
How It Works
No mystery, no runaround. Here’s how the job goes.
Fill in the quote form or give us a call. Tell us what you want to run, such as an EV charger or ducted air con.
I inspect your service line, mains and switchboard. Then you get a clear quote before any work starts.
We handle the application, the new mains and the connection.
We upgrade your switchboard to match and test before we leave. Where it’s required, you’ll get a Certificate of Compliance for Electrical Work.
Reviews
“Ryan and Connor from Altech Electrical replaced all of our old lights with new halogen units. They were very efficient, the price was great, and they cleaned up after the work. This is the 3rd time that we have used them and I would recommend them for any electrical job, large or small.”
“I had a great experience using Ryan to do our new fans, new power points, light fittings etc. He was on time which is important to me, did a great job and prices where reasonable when I looked around for quotes. Would use him again if I needed to.”
FAQs
Most homes run well on single phase power. Three phase becomes worth considering when you add more large appliances.
It depends on the property. Access, a private power pole, the meter box, excavation and tree trimming all change the price.
Count the service fuses on your meter board, or look at the width of the main switch. Three service fuses means three phase power.
Single phase suits lower demand and is what most homes run on. See single phase vs three phase power for the full comparison.
No. Most homes charge happily on single phase with a 7kW charger.
The on site work typically takes 1 to 3 hours. Larger or complex properties can take up to 4 hours.
Yes, during the changeover. That typically takes 1 to 3 hours, or up to 4 hours for larger or complex properties.
Yes. We handle single phase to three phase upgrades and the switchboard work that goes with them.
Where it’s required, you’ll get a Certificate of Compliance for Electrical Work.
We’re based in Loftus and work across the Sutherland Shire. See our Sutherland Shire service area page for details.
Send us the quote form and we’ll come back to you with a clear price.
Prefer to talk? Call us on 0413 064 474.
Altech Electrical home · Areas we cover · Level 2 electrician · Switchboard upgrades · EV chargers · Meet the owner