Electrical Rough In for Renovations & New Builds in Sutherland Shire
What is an electrical rough in, and why does it matter so much?
An electrical rough in is the hidden wiring we run before your walls and ceilings are closed. Get it right and the rest of your build runs smoothly.
I'm Ryan James Alderman, owner and director of Altech Electrical. I've been an electrician for more than 10 years, and our company holds NSW Contractor Licence 315687C.
We're based in Loftus and handle rough in and fit off work across the Sutherland Shire. Our customers rate us 5.0 from 26 Google reviews.
- Licensed electrical contractor, Lic 315687C
- A clear quote before any work starts
- Certificate of Compliance for Electrical Work where required
- Open 24 hours, 7 days, including public holidays
Rough In Explained
What Is an Electrical Rough In?
Think of rough in as the skeleton of your electrics. Nobody sees it once the plaster goes on, but everything depends on it.
At this stage we run cable, set out circuits and fix the boxes for every switch, power point and light. Your electrical plan gets locked into the frame.
Rough in vs fit off at a glance
| Stage | When it happens | What we do |
|---|---|---|
| Rough in (first fix) | Frame is up, walls still open | Run cable, install new circuits, fix boxes, prepare appliance circuits |
| Fit off (second fix) | Walls lined and painted | Fit switches, power points, lights, smoke alarms and appliances, then test |
Tip: rough in is the cheap time to change your mind. After plaster, every change means cutting, patching and repainting.
Where rough in sits in your build
- You settle the layout and electrical plan
- Framing goes up
- We complete the electrical rough in
- Walls and ceilings are lined, then painted
- We return for fit off, testing and your certificate
Rough In Checklist
What to Decide Before Your Rough In Starts in Sutherland Shire
Rough in isn't the first step. It depends on decisions you make before we arrive.
When choices are still up in the air, wiring gets guessed. Guessed wiring is how you end up with a light switch behind the fridge.
The pre rough in checklist
- How each room will be used
- Where every light goes and which switch runs it
- Power point positions and heights
- Your major appliances and what they need
- New loads on the switchboard
- Data, TV or smart home points
- Anything you might add later
Kitchen rough in checklist
Kitchens are the hungriest room in the house. Plan these before we start.
- A dedicated circuit for the oven
- A dedicated circuit for an induction cooktop
- Plenty of benchtop power points
- Fridge position and power
- Dishwasher and microwave loads
- Under cabinet lighting
- Power for the island bench
- Rangehood wiring
Induction cooktops often need new cable and can push an old switchboard past its limit.
Bathroom and laundry rough in
Water and electricity are a bad mix, so wet areas need extra care. The Wiring Rules, AS/NZS 3000, set zones where fittings can and can't go.
- Lights and switches placed to suit the wet area zones
- Exhaust fan wiring
- Power points in safe positions
- Safety switch (RCD) protection on new circuits
- Heated towel rail wiring
- Heat lamp wiring
- Underfloor heating supply
Living areas, bedrooms and home offices
- Extra power points where furniture will sit
- USB power points by beds and desks
- Ceiling fan wiring and a solid mounting point
- Feature and dimmable lighting
- Data points and network cabling
Ceiling fans need the right support and wiring. Both are easiest to sort at rough in.
Future proofing for EV chargers and solar
A renovation is the best time to plan for tomorrow. It's like packing a jacket: easier to bring it than to go back.
- Spare space on the switchboard
- Conduit to the garage or carport
- A planned circuit for an EV charger
- A check on single phase or three phase supply
Switchboard & Commercial
Switchboard Capacity and Commercial Rough Ins in Sutherland Shire
New circuits are only as good as the board feeding them. We check it before we run a single cable.
Can your switchboard handle the new circuits?
| What we check | Why it matters |
|---|---|
| Spare breaker space | New circuits need somewhere to go |
| Existing safety switches | New work needs RCD protection |
| Load calculation | Stops overloads when everything runs at once |
| Cable condition | Old cable may need replacing |
| Meter panel | Older panels can hold up the job |
Older fuse boxes often need a switchboard upgrade before the renovation can go ahead. See our switchboard upgrade page.
Commercial renovation rough ins
Shops and offices bring their own list. We plan these with you and your building manager.
- Emergency and exit lighting circuits
- Load balancing across circuits
- Three phase power needs
- Compliance paperwork
- Access and power off times
Supply changes that touch network equipment are done by Ausgrid or a Level 2 ASP. Visit our commercial electrician page.
Common Mistakes
Common Rough In Mistakes Sutherland Shire Renovators Make
- Underestimating how much power the new space needs
- Keeping an ageing switchboard that can't cope
- Too few power points, then a tangle of power boards
- Changing the layout after rough in
- Leaving appliance choices until the last minute
- Forgetting EV chargers and solar
- Not allowing time for testing and compliance checks
Each one costs more to fix after plaster than before it.
How It Works
How Altech Handles Your Rough In and Fit Off in Sutherland Shire
We work with homeowners, builders and renovators. You'll always know what's happening and what comes next.
Our step by step process
- Plan: we walk the site for free, go through your plans and check the switchboard
- Quote: you get a clear quote before any work starts
- Rough in: we run cable and fix every box to the agreed plan
- Fit off: once painting is done, we fit switches, lights and appliances
- Test and certify: every circuit is tested, and you get a CCEW where required
Licensed, checked and accountable
- Company licence: NSW Contractor Licence 315687C, Altech Electrical Pty Ltd
- Owner's licence: Ryan James Alderman, NSW Contractor Licence 299501C
- Training: BHP apprenticeship and Certificate III in Electrotechnology Electrician, TAFE NSW, both 2010
- Police check: National Police Check, current
- Hours: open 24 hours, 7 days, including public holidays
You can check both licences on the NSW Government Verify Licence service.
What our customers say
“I recently used Altech to re-wire and re-fit my house. Ryan was professional and well organised, keeping me informed and up to date throughout the installation. I will be using Altech for any further electrical needs.”
We also handle wiring and rewiring across the Sutherland Shire.
FAQs
Electrical Rough In FAQs for Sutherland Shire Homes
What is an electrical rough in?
It's the stage where we run hidden cable and fix boxes before the walls close. It sets up everything you'll see at fit off.
When should the electrician come in?
After the frame is up and before the plasterer arrives. Book early, because the plasterer can't start until rough in is done.
Can I move a power point after rough in?
Yes, but it costs more once walls are lined. Moving it on the frame is quick, while moving it later means cutting and patching.
Do I need a switchboard upgrade for my renovation?
Not always. We check spare space, safety switches and load first, then tell you straight.
How much does an electrical rough in cost?
It depends on the size of the job, the number of circuits and your switchboard. We quote first, so you'll know the price before we start.
Will I get a compliance certificate?
Yes, where one is required. You receive a Certificate of Compliance for Electrical Work after testing.
Planning a renovation or extension?
Send us your plans and we’ll come back with a clear rough in quote.